| • | The Project Inspectors will continue to work the same scheduled hours as the Contractor. |
| • | If the Contractor is working 5-8 hour days, the inspector will as well. |
| • | If the Contractor is working different hours, according to the contract or as agreed upon with Engineering, the inspector will work those hours. |
| • | Building inspectors and chiefs will remain on the 5-day a week schedule and inspections will not be impacted. |
| • | Building inspections for Friday will be conducted as scheduled. |
| • | Inspections for Monday will need to be scheduled through the IVR system (313-6100) |
| | For emergency support in the event of a major service disruption (power failures or utility repairs) requiring immediate inspections and/or |
| | permits outside of operational hours, please call 478-7510 or 472-2642. |